§ 295-8. Inspection.  


Latest version.
  • A. 
    All stages of the construction of an individual sewage disposal system shall be subject to inspection by a duly authorized representative of the Board of Health to determine compliance with the terms of the certificate of compliance (location and design) issued therefor. The Board of Health shall be notified at least five working days prior to the commencement of the construction of any such system. During the course of construction, inspections shall be made as follows:
    (1) 
    First inspection after the excavation is completed.
    (2) 
    Second inspection after the piping has been installed.
    (3) 
    Third inspection after the grading of the finished surface.
    B. 
    No part of an individual sewage disposal system shall be covered from view until the second inspection enumerated above has been made and the construction work approved.
    C. 
    Additional inspections may be made at the discretion of any duly authorized representative of the Board of Health.
    D. 
    Construction work at each stage shall be completed in such manner as to minimize the number of inspections required.
Added 8-8-1988